Skip to content Skip to search

Search results

You searched for strategic flood risk

Results 91 – 100 of about 555.

  • Draft River Wensum Strategy Annex - July 2017

    The LLFA has a duty to develop, maintain and deliver a strategy for the management of local flood risk, to investigate significant flooding and to advise on the ...

    https://www.norwich.gov.uk/download/downloads/id/4036/annex.pdf
  • Context: Global to Local | Environmental strategy 2020-25 | Norwich ...

    If the average global warming was limited to 1.5°C, it still worsens the risks of drought, floods, extreme heat and poverty for hundreds of millions of people.

    https://www.norwich.gov.uk/info/20195/policies_plans_and_strategies/3606/environmental_strategy_2020-25/4
  • River Wensum Strategy - Management and partnership working

    It is also responsible for managing the risk of flooding from main rivers, reservoirs, estuaries and the sea and supports flood and environmental incidents.

    https://www.norwich.gov.uk/download/downloads/id/4737/river_wensum_strategy_-_management_and_partnership_working.pdf
  • Untitled

    The aim of the water strategy is to provide betterment to the marsh without causing a detriment in relation to flood risk, and in order to create a sustainable ...

    https://www.norwich.gov.uk/download/downloads/id/9223/055-das-06-nature.pdf
  • Cabinet report - Regulation 10a review

    Nov 13, 2019 ... different strategy or strategic ... Also, a revised Greater Norwich Strategic Flood. Risk Assessment (2017) has updated the flood zone boundaries, ...

    https://www.norwich.gov.uk/download/downloads/id/5465/cabinet_report_-_13_november_2019.pdf
  • Anglia Square, Norwich Proposed Surface Water Drainage Strategy ...

    ... Flood Risk Assessment by Royal Haskoning DHV. Application Ref. 22/00434/F follows a previous application on a somewhat smaller development parcel, (NCC Ref ...

    https://www.norwich.gov.uk/download/downloads/id/8659/proposed_surface_water_drainage_strategy_part_1.pdf
  • R35: Land at Havers Road | Site specific allocations in the ...

    The Dolphin Path, a strategic pedestrian / cycle route, forms the eastern boundary of the site. ... Therefore a flood risk assessment is required for this site ...

    https://www.norwich.gov.uk/info/20199/adopted_local_plan/1582/site_specific_allocations_in_the_remainder_of_the_city/35
  • DM3 Delivering high quality design | Development management ...

    d) promote and facilitate sustainable drainage and mitigate against flood risk from surface water runoff as required by policy DM5. Supplementary text. 3.1 ...

    https://www.norwich.gov.uk/info/20199/adopted_local_plan/1457/development_management_policies/3
  • R38: Three Score, Bowthorpe | Site specific allocations in the ...

    Environmental Impact Assessment, biodiversity appraisal, archaeological investigation, a geotechnical study and utilities report and a flood risk assessment ...

    https://www.norwich.gov.uk/info/20199/adopted_local_plan/1582/site_specific_allocations_in_the_remainder_of_the_city/38
  • Appendix 4: Glossary

    Critical Drainage Catchments: Areas in which development is likely to contribute to an elevated risk of surface water flooding in the most flood vulnerable ...

    https://www.norwich.gov.uk/info/20242/site_allocations_and_site_specific_policies/1670/appendix_4_glossary
Feedback button
Feedback button